Using ultrasonic and finite element for residual stress evaluation of a gas transmission pipeline

Yashar Javadi, John A. Goldak, Kamran Imani Fooladi, Mohammadhossein Nimrouzi

Research output: Contribution to journalArticle

Abstract

Once weld-induced residual stresses are mitigated, the risk of catastrophic failures in gas transmission pipelines is expected to decrease. Large-diameter pipelines are used extensively for gas transmission between cities. In large-diameter pipes, it is normal procedure to employ two or three welders working simultaneously to complete the joint. However, the number of welders, as well as the delay time, can influence the welding residual stress, which is considered in this paper. To this end, five welds completed with different welding procedures have been investigated on a large-diameter, 610 mm gas transmission pipeline. The welding residual stresses were measured using the ultrasonic method, a nondestructive stress measurement technique that works based on the acoustoelasticity law. The finite element method was also employed for modeling of the specimens in order to numerically validate the measurements. The results show that employing four welders welding simultaneously on a 610 mm diameter pipeline can considerably reduce the welding residual stress in comparison with a case of using one or two welders. Furthermore, a delay time between starting the segmental welding can create a preheating effect that leads to mitigation in the residual stresses.
LanguageEnglish
Pages192-202
Number of pages11
JournalMaterials Evaluation
Volume76
Issue number2
Publication statusPublished - 1 Feb 2018

Fingerprint

Residual stresses
Welding
Pipelines
Gases
Ultrasonics
Time delay
Welds
Preheating
Stress measurement
Elasticity
Pipe
Finite element method

Keywords

  • welding residual stress
  • gas transmission pipeline
  • ultrasonic stress measurement
  • acoustoelasticity
  • weld modelling
  • simultaneous welding

Cite this

Javadi, Yashar ; Goldak, John A. ; Imani Fooladi, Kamran ; Nimrouzi, Mohammadhossein. / Using ultrasonic and finite element for residual stress evaluation of a gas transmission pipeline. In: Materials Evaluation. 2018 ; Vol. 76, No. 2. pp. 192-202.
@article{c9e7147f70094c1fbbb0fac2655f2545,
title = "Using ultrasonic and finite element for residual stress evaluation of a gas transmission pipeline",
abstract = "Once weld-induced residual stresses are mitigated, the risk of catastrophic failures in gas transmission pipelines is expected to decrease. Large-diameter pipelines are used extensively for gas transmission between cities. In large-diameter pipes, it is normal procedure to employ two or three welders working simultaneously to complete the joint. However, the number of welders, as well as the delay time, can influence the welding residual stress, which is considered in this paper. To this end, five welds completed with different welding procedures have been investigated on a large-diameter, 610 mm gas transmission pipeline. The welding residual stresses were measured using the ultrasonic method, a nondestructive stress measurement technique that works based on the acoustoelasticity law. The finite element method was also employed for modeling of the specimens in order to numerically validate the measurements. The results show that employing four welders welding simultaneously on a 610 mm diameter pipeline can considerably reduce the welding residual stress in comparison with a case of using one or two welders. Furthermore, a delay time between starting the segmental welding can create a preheating effect that leads to mitigation in the residual stresses.",
keywords = "welding residual stress, gas transmission pipeline, ultrasonic stress measurement, acoustoelasticity, weld modelling, simultaneous welding",
author = "Yashar Javadi and Goldak, {John A.} and {Imani Fooladi}, Kamran and Mohammadhossein Nimrouzi",
year = "2018",
month = "2",
day = "1",
language = "English",
volume = "76",
pages = "192--202",
journal = "Materials Evaluation",
issn = "0025-5327",
number = "2",

}

Javadi, Y, Goldak, JA, Imani Fooladi, K & Nimrouzi, M 2018, 'Using ultrasonic and finite element for residual stress evaluation of a gas transmission pipeline' Materials Evaluation, vol. 76, no. 2, pp. 192-202.

Using ultrasonic and finite element for residual stress evaluation of a gas transmission pipeline. / Javadi, Yashar; Goldak, John A.; Imani Fooladi, Kamran; Nimrouzi, Mohammadhossein.

In: Materials Evaluation, Vol. 76, No. 2, 01.02.2018, p. 192-202.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Using ultrasonic and finite element for residual stress evaluation of a gas transmission pipeline

AU - Javadi, Yashar

AU - Goldak, John A.

AU - Imani Fooladi, Kamran

AU - Nimrouzi, Mohammadhossein

PY - 2018/2/1

Y1 - 2018/2/1

N2 - Once weld-induced residual stresses are mitigated, the risk of catastrophic failures in gas transmission pipelines is expected to decrease. Large-diameter pipelines are used extensively for gas transmission between cities. In large-diameter pipes, it is normal procedure to employ two or three welders working simultaneously to complete the joint. However, the number of welders, as well as the delay time, can influence the welding residual stress, which is considered in this paper. To this end, five welds completed with different welding procedures have been investigated on a large-diameter, 610 mm gas transmission pipeline. The welding residual stresses were measured using the ultrasonic method, a nondestructive stress measurement technique that works based on the acoustoelasticity law. The finite element method was also employed for modeling of the specimens in order to numerically validate the measurements. The results show that employing four welders welding simultaneously on a 610 mm diameter pipeline can considerably reduce the welding residual stress in comparison with a case of using one or two welders. Furthermore, a delay time between starting the segmental welding can create a preheating effect that leads to mitigation in the residual stresses.

AB - Once weld-induced residual stresses are mitigated, the risk of catastrophic failures in gas transmission pipelines is expected to decrease. Large-diameter pipelines are used extensively for gas transmission between cities. In large-diameter pipes, it is normal procedure to employ two or three welders working simultaneously to complete the joint. However, the number of welders, as well as the delay time, can influence the welding residual stress, which is considered in this paper. To this end, five welds completed with different welding procedures have been investigated on a large-diameter, 610 mm gas transmission pipeline. The welding residual stresses were measured using the ultrasonic method, a nondestructive stress measurement technique that works based on the acoustoelasticity law. The finite element method was also employed for modeling of the specimens in order to numerically validate the measurements. The results show that employing four welders welding simultaneously on a 610 mm diameter pipeline can considerably reduce the welding residual stress in comparison with a case of using one or two welders. Furthermore, a delay time between starting the segmental welding can create a preheating effect that leads to mitigation in the residual stresses.

KW - welding residual stress

KW - gas transmission pipeline

KW - ultrasonic stress measurement

KW - acoustoelasticity

KW - weld modelling

KW - simultaneous welding

UR - https://ndtlibrary.asnt.org/2018/UsingUltrasonicandFiniteElementforResidualStressEvaluationofaGasTransmissionPipeline

M3 - Article

VL - 76

SP - 192

EP - 202

JO - Materials Evaluation

T2 - Materials Evaluation

JF - Materials Evaluation

SN - 0025-5327

IS - 2

ER -