The numbers game: 24 hours (to Tulsa?)

Research output: Contribution to journalArticle

Abstract

To build anything requires a variety of statutory approvals and co-operation from a significant number of utilities. Such complexity invariably produces stumbling blocks and delays to the process, but of all of these hurdles, gaining planning permission is undoubtedly the most fraught.
LanguageEnglish
Pages14-14
Number of pages1
JournalScotregen, Scottish Urban Regeneration Forum
Issue number46
Publication statusPublished - 2009

Fingerprint

Planning
planning
co-operation
approval
planning permission

Keywords

  • architecture
  • planning system
  • building design

Cite this

@article{0861d7104e6a475c83255aa7dd1cdd8a,
title = "The numbers game: 24 hours (to Tulsa?)",
abstract = "To build anything requires a variety of statutory approvals and co-operation from a significant number of utilities. Such complexity invariably produces stumbling blocks and delays to the process, but of all of these hurdles, gaining planning permission is undoubtedly the most fraught.",
keywords = "architecture, planning system, building design",
author = "Stirling Howieson",
year = "2009",
language = "English",
pages = "14--14",
journal = "Scotregen, Scottish Urban Regeneration Forum",
number = "46",

}

The numbers game : 24 hours (to Tulsa?). / Howieson, Stirling.

In: Scotregen, Scottish Urban Regeneration Forum, No. 46, 2009, p. 14-14.

Research output: Contribution to journalArticle

TY - JOUR

T1 - The numbers game

T2 - Scotregen, Scottish Urban Regeneration Forum

AU - Howieson, Stirling

PY - 2009

Y1 - 2009

N2 - To build anything requires a variety of statutory approvals and co-operation from a significant number of utilities. Such complexity invariably produces stumbling blocks and delays to the process, but of all of these hurdles, gaining planning permission is undoubtedly the most fraught.

AB - To build anything requires a variety of statutory approvals and co-operation from a significant number of utilities. Such complexity invariably produces stumbling blocks and delays to the process, but of all of these hurdles, gaining planning permission is undoubtedly the most fraught.

KW - architecture

KW - planning system

KW - building design

UR - https://www.surf.scot

M3 - Article

SP - 14

EP - 14

JO - Scotregen, Scottish Urban Regeneration Forum

JF - Scotregen, Scottish Urban Regeneration Forum

IS - 46

ER -