Abstract
While risk quantification research has grown over the last few decades, only a limited number of studies have addressed the overall process integration of these approaches in design risk management. This paper argues that the choice of risk quantification method has strong implications for several process aspects. We investigate current risk management maturity models and suggest an expansion to accommodate requirements originating from the choice of quantification method, and to inform the choice of quantification method, based on other process parameters, validated through 3 case companies.
Original language | English |
---|---|
Title of host publication | DS 92: Proceedings of the DESIGN 2018 15th International Design Conference |
Editors | D. Marjanović, M. Štorga, S. Škec, N. Bojčetić, N. Pavković |
Place of Publication | Glasgow, UK |
Pages | 667-678 |
Number of pages | 12 |
DOIs | |
Publication status | Published - 24 May 2018 |
Event | 15th International Design Conference (Design 2018) - Hotel Dubrovnik Palace, Dubrovnik, Croatia Duration: 21 May 2018 → 24 May 2018 Conference number: 15 http://www.designconference.org/ |
Conference
Conference | 15th International Design Conference (Design 2018) |
---|---|
Abbreviated title | Design 2018 |
Country/Territory | Croatia |
City | Dubrovnik |
Period | 21/05/18 → 24/05/18 |
Internet address |
Keywords
- design process
- risk management
- uncertainty
- risk management maturity
- tailoring approach