Abstract

The offshore wind industry has historically focused on setting up new projects, with the decommissioning phase receiving little attention. This can cause future problems as decommissioning needs to be planned at the beginning to prevent complications that may arise, as it implies important operations and high costs. There are numerous features that make decommissioning a challenge, such as the marine environment, the technical limitations of vessels and the lack of specific regulations that determine what should be done, increasing the uncertainty of the process. Additionally, the unique characteristics of the sites involve exclusive optimal solutions for each project. This article analyses the
main operation parameters that affect the decommissioning process, identifying the benefits and drawbacks of the influencing variables. A model is designed to compare different transportation strategies, searching for cost reduction. A decommissioning methodology is been proposed based on this analysis, taking into consideration the technical aspects of the process, and minimising environmental impacts. The model forecasts that the predicted duration and costs of this process are not being adequately captured in site decommissioning plans.
LanguageEnglish
Pages470-480
Number of pages11
JournalRenewable Energy
Volume102
Issue numberPart B
Early online date2 Nov 2016
DOIs
Publication statusPublished - 31 Mar 2017

Fingerprint

Offshore wind farms
Cost reduction
Environmental impact
Costs
Industry
Uncertainty

Keywords

  • decommissioning
  • sustainable
  • offshore wind energy
  • offshore wind farms
  • marine renewable energy

Cite this

@article{82f66c7375544ff18df88d0c5e77e090,
title = "Sustainable decommissioning of an offshore wind farm",
abstract = "The offshore wind industry has historically focused on setting up new projects, with the decommissioning phase receiving little attention. This can cause future problems as decommissioning needs to be planned at the beginning to prevent complications that may arise, as it implies important operations and high costs. There are numerous features that make decommissioning a challenge, such as the marine environment, the technical limitations of vessels and the lack of specific regulations that determine what should be done, increasing the uncertainty of the process. Additionally, the unique characteristics of the sites involve exclusive optimal solutions for each project. This article analyses themain operation parameters that affect the decommissioning process, identifying the benefits and drawbacks of the influencing variables. A model is designed to compare different transportation strategies, searching for cost reduction. A decommissioning methodology is been proposed based on this analysis, taking into consideration the technical aspects of the process, and minimising environmental impacts. The model forecasts that the predicted duration and costs of this process are not being adequately captured in site decommissioning plans.",
keywords = "decommissioning, sustainable, offshore wind energy, offshore wind farms, marine renewable energy",
author = "Eva Topham and David McMillan",
year = "2017",
month = "3",
day = "31",
doi = "10.1016/j.renene.2016.10.066",
language = "English",
volume = "102",
pages = "470--480",
journal = "Renewable Energy",
issn = "0960-1481",
number = "Part B",

}

Sustainable decommissioning of an offshore wind farm. / Topham, Eva; McMillan, David.

In: Renewable Energy, Vol. 102, No. Part B, 31.03.2017, p. 470-480.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Sustainable decommissioning of an offshore wind farm

AU - Topham, Eva

AU - McMillan, David

PY - 2017/3/31

Y1 - 2017/3/31

N2 - The offshore wind industry has historically focused on setting up new projects, with the decommissioning phase receiving little attention. This can cause future problems as decommissioning needs to be planned at the beginning to prevent complications that may arise, as it implies important operations and high costs. There are numerous features that make decommissioning a challenge, such as the marine environment, the technical limitations of vessels and the lack of specific regulations that determine what should be done, increasing the uncertainty of the process. Additionally, the unique characteristics of the sites involve exclusive optimal solutions for each project. This article analyses themain operation parameters that affect the decommissioning process, identifying the benefits and drawbacks of the influencing variables. A model is designed to compare different transportation strategies, searching for cost reduction. A decommissioning methodology is been proposed based on this analysis, taking into consideration the technical aspects of the process, and minimising environmental impacts. The model forecasts that the predicted duration and costs of this process are not being adequately captured in site decommissioning plans.

AB - The offshore wind industry has historically focused on setting up new projects, with the decommissioning phase receiving little attention. This can cause future problems as decommissioning needs to be planned at the beginning to prevent complications that may arise, as it implies important operations and high costs. There are numerous features that make decommissioning a challenge, such as the marine environment, the technical limitations of vessels and the lack of specific regulations that determine what should be done, increasing the uncertainty of the process. Additionally, the unique characteristics of the sites involve exclusive optimal solutions for each project. This article analyses themain operation parameters that affect the decommissioning process, identifying the benefits and drawbacks of the influencing variables. A model is designed to compare different transportation strategies, searching for cost reduction. A decommissioning methodology is been proposed based on this analysis, taking into consideration the technical aspects of the process, and minimising environmental impacts. The model forecasts that the predicted duration and costs of this process are not being adequately captured in site decommissioning plans.

KW - decommissioning

KW - sustainable

KW - offshore wind energy

KW - offshore wind farms

KW - marine renewable energy

UR - http://www.sciencedirect.com/science/journal/09601481

U2 - 10.1016/j.renene.2016.10.066

DO - 10.1016/j.renene.2016.10.066

M3 - Article

VL - 102

SP - 470

EP - 480

JO - Renewable Energy

T2 - Renewable Energy

JF - Renewable Energy

SN - 0960-1481

IS - Part B

ER -