Abstract
Worldwide, there are numerous reports of major infrastructure projects failing at handover to the operations phase following completion of the project development and delivery phase. While poor risk identification and prioritization has been identified as one of the causes of this failure, we know little about the specific risk factors project beneficiaries consider most important at this point of handover. With these issues in mind, we draw on a survey of key dry port project beneficiaries in Brazil to examine and prioritize the risks considered most important at handover to operations. Paying particular attention to project beneficiary heterogeneity and incongruence, we find eight key risk factors – ‘Cost’, ‘Location’, ‘Infrastructure’, ‘Accessibility’, ‘Operational’, ‘Economic’, ‘Political and social’, and ‘Environment’ that warrant emphasis. We reveal congruence among some project beneficiaries in terms of prioritization. We also find variations in handover to operations risks based on project characteristics. However, these characteristics appear to have very limited impact on prioritization. Our findings further point to risk blind spots at critical moments of project handover to operations. Overall, this paper contributes to project risk management/prioritization literature in the context of handover to operations.
Original language | English |
---|---|
Article number | 102558 |
Journal | International Journal of Project Management |
Volume | 42 |
Issue number | 1 |
Early online date | 30 Dec 2023 |
DOIs | |
Publication status | Published - 1 Jan 2024 |
Funding
The authors are grateful for financial support obtained from FACEPE (Fundação de Amparo a Ciência e Tecnologia do Estado de Pernambuco) and CAPES (Coordenação de Aperfeiçoamento de Pessoal de Nível Superior) to support the research.
Keywords
- handover to operations
- infrastructure
- operations
- prioritization
- projects
- risks