Projects per year
Projects
- 1 Finished
Search results
-
Finished
Reliability-Cost Analysis of Subsea Transmission Cables (with BVG) [£10,000]
EPSRC (Engineering and Physical Sciences Research Council)
1/11/17 → 28/02/18
Project: Knowledge Exchange