Projects per year
Abstract
The present report forms the Project Deliverable ‘D 2.2’ of the DERlab NoE project, supported by the EC under Contract No. SES6-CT-518299 NoE DERlab.
The present document discuss the power system services that may be provided from DER units and the related methods to test the services actually provided, both at component level and at system level.
The present document discuss the power system services that may be provided from DER units and the related methods to test the services actually provided, both at component level and at system level.
Original language | English |
---|---|
Number of pages | 30 |
Publication status | Published - Dec 2011 |
Keywords
- power flow
- power systems
- testing
- power system services
Projects
- 1 Finished
Equipment
-
Dynamic Power Systems Laboratory
Graeme Burt (Manager)
Electronic And Electrical EngineeringFacility/equipment: Facility
Activities
- 1 Visiting an external academic institution
-
Technical University of Denmark
Paul Crolla (Visiting researcher)
6 Jun 2011 → 1 Jul 2011Activity: Visiting an external institution types › Visiting an external academic institution