Abstract

This paper demonstrates the feasibility of radiometric on-line circuit breaker timing. The timing test is crucial and can reveal a wide range of faults or defects. The work presented concentrates on the timing of gas-insulated substation (GIS) circuit breakers, which due to their enclosed nature pose a variety of challenges not encountered in air insulated substations (AIS). It is demonstrated how key events in the arcing process such as arc ignition and extinctions can be identified from the emitted electromagnetic pulses and how this information can be used to assess the integrity of the circuit breaker being monitored. The results are backed by site measurements of a high voltage reactor switching double pole puffer breaker. The proposed technique can readily be extended to monitor closing operations as well as being adapted to monitor other types of circuit breakers.
Original languageEnglish
Pages (from-to)1411-1417
Number of pages7
JournalIEEE Transactions on Power Delivery
Volume26
Issue number3
DOIs
Publication statusPublished - Jul 2011

Keywords

  • extremely high voltage (EHV) circuit breakers (CBs)
  • fault diagnosis
  • monitoring
  • circuit-breaker (CB) testing
  • industrial power system testing
  • arc discharges
  • electromagnetic reactive interference
  • switchgear testing
  • radiometric timing
  • high-voltage circuit-breaker
  • opening operations