NINES Project: 2A Battery Operational Effectiveness

Fulin Fan, Han Xu, Ivana Kockar, Stevie Adams, Nathan Coote

Research output: Book/ReportCommissioned report

29 Downloads (Pure)

Abstract

This report provides a detailed review of the operational effectiveness of a valve regulated lead-acid (VRLA) Battery Energy Storage System (BESS) which has been installed as part of the NINES Project at Lerwick Power Station (LPS) on a distribution network operated by Scottish and Southern Electricity Networks (SSEN) in Shetland. The grid-scale VRLA BESS plays an important role in the time-shifting of conventional generation and renewable energy on the Shetland network.
Original languageEnglish
Place of PublicationGlasgow
PublisherScottish & Southern Electricity Networks
Number of pages49
Publication statusPublished - 4 Dec 2017

Keywords

  • valve regulated lead-acid
  • VRLA
  • battery energy storage system
  • BESS
  • distribution networks
  • renewable energy

Fingerprint Dive into the research topics of 'NINES Project: 2A Battery Operational Effectiveness'. Together they form a unique fingerprint.

Cite this