Abstract

This report provides a detailed review of the operational effectiveness of a valve regulated lead-acid (VRLA) Battery Energy Storage System (BESS) which has been installed as part of the NINES Project at Lerwick Power Station (LPS) on a distribution network operated by Scottish and Southern Electricity Networks (SSEN) in Shetland. The grid-scale VRLA BESS plays an important role in the time-shifting of conventional generation and renewable energy on the Shetland network.
Original languageEnglish
Place of PublicationGlasgow
PublisherScottish & Southern Electricity Networks
Number of pages49
Publication statusPublished - 4 Dec 2017

Keywords

  • valve regulated lead-acid
  • VRLA
  • battery energy storage system
  • BESS
  • distribution networks
  • renewable energy

Fingerprint Dive into the research topics of 'NINES Project: 2A Battery Operational Effectiveness'. Together they form a unique fingerprint.

  • Projects

    Research Output

    • 3 Commissioned report
    • 1 Paper
    Open Access
    File
  • NINES: 4B ANM Operational Effectiveness Report

    Kockar, I., Xu, H., Shelha, K., Adams, S. & Coote, N., 4 Dec 2017, Glasgow: Scottish & Southern Electricity Networks. 39 p.

    Research output: Book/ReportCommissioned report

    Open Access
    File
  • NINES project: 6A Commercial Arrangements and Economics Report

    Adams, S., Allan, G., FAN, F., Kockar, I. & Xu, H., 4 Dec 2017, Glasgow: Scottish & Southern Electricity Networks. 66 p.

    Research output: Book/ReportCommissioned report

    Open Access
    File
  • Cite this

    Fan, F., Xu, H., Kockar, I., Adams, S., & Coote, N. (2017). NINES Project: 2A Battery Operational Effectiveness. Glasgow: Scottish & Southern Electricity Networks.