Modelling economic risks in megaproject construction: a systemic approach

Prince Boateng, Dominic Ahiaga-Dagbui, Zhen Chen, Stephen Ogunlana

Research output: Chapter in Book/Report/Conference proceedingConference contribution book

3 Citations (Scopus)

Abstract

Megaprojects present significant economic risks to their financiers and sponsors. Factors such as inflation, cash flow issues, material and energy price hikes and change in government policies can cause such capital intensive projects to overrun planned budget and schedule allocations. Where the project is a commercial asset, delayed completion time and cost overruns usually have significant impact on the profitability of the project as well as the estimated returns on investment over the operational phase of the project. Understanding the dynamics of specific risks can thus be very crucial in designing containment measures to deal with their likely impact on the project. Using a case-study of the Edinburgh Trams project in Scotland, the dynamics of identified economic risks in transportation megaprojects is presented. Through the combination of interviews, questionnaires and non-participant observation, different economic risk factors were first identified. The identified factors were then prioritised using Analytical Network Process (ANP) to establish the most salient economic variables on the Tram project. Some of these factors include material and energy price increases as a result of the 2008 recession, as well as inflation and changes in government funding policies. The selected factors from the ANP were then modelled within a System Dynamics (SD) framework to appraise their measured economic impact on the project to gain a fuller understanding of the interrelationships between the variables in the system. The mean impact of economic risks on Edinburgh Trams was estimated to be about 22%.
LanguageEnglish
Title of host publicationProceedings of the 31st Annual Association of Researchers in Construction Management Conference
Pages115-124
Number of pages10
Publication statusPublished - 9 Sep 2015
Externally publishedYes

Fingerprint

Economics
Profitability
Dynamical systems
Costs

Keywords

  • analytical network process
  • system dynamics
  • megaproject
  • Edinburgh trams
  • economic risk
  • cost overruns

Cite this

Boateng, P., Ahiaga-Dagbui, D., Chen, Z., & Ogunlana, S. (2015). Modelling economic risks in megaproject construction: a systemic approach. In Proceedings of the 31st Annual Association of Researchers in Construction Management Conference (pp. 115-124)
Boateng, Prince ; Ahiaga-Dagbui, Dominic ; Chen, Zhen ; Ogunlana, Stephen. / Modelling economic risks in megaproject construction : a systemic approach. Proceedings of the 31st Annual Association of Researchers in Construction Management Conference. 2015. pp. 115-124
@inproceedings{de8329b189d84a9c8fa4cb7ca266c6ac,
title = "Modelling economic risks in megaproject construction: a systemic approach",
abstract = "Megaprojects present significant economic risks to their financiers and sponsors. Factors such as inflation, cash flow issues, material and energy price hikes and change in government policies can cause such capital intensive projects to overrun planned budget and schedule allocations. Where the project is a commercial asset, delayed completion time and cost overruns usually have significant impact on the profitability of the project as well as the estimated returns on investment over the operational phase of the project. Understanding the dynamics of specific risks can thus be very crucial in designing containment measures to deal with their likely impact on the project. Using a case-study of the Edinburgh Trams project in Scotland, the dynamics of identified economic risks in transportation megaprojects is presented. Through the combination of interviews, questionnaires and non-participant observation, different economic risk factors were first identified. The identified factors were then prioritised using Analytical Network Process (ANP) to establish the most salient economic variables on the Tram project. Some of these factors include material and energy price increases as a result of the 2008 recession, as well as inflation and changes in government funding policies. The selected factors from the ANP were then modelled within a System Dynamics (SD) framework to appraise their measured economic impact on the project to gain a fuller understanding of the interrelationships between the variables in the system. The mean impact of economic risks on Edinburgh Trams was estimated to be about 22{\%}.",
keywords = "analytical network process, system dynamics , megaproject, Edinburgh trams, economic risk, cost overruns",
author = "Prince Boateng and Dominic Ahiaga-Dagbui and Zhen Chen and Stephen Ogunlana",
year = "2015",
month = "9",
day = "9",
language = "English",
isbn = "978-0-9552390-9-0",
pages = "115--124",
booktitle = "Proceedings of the 31st Annual Association of Researchers in Construction Management Conference",

}

Boateng, P, Ahiaga-Dagbui, D, Chen, Z & Ogunlana, S 2015, Modelling economic risks in megaproject construction: a systemic approach. in Proceedings of the 31st Annual Association of Researchers in Construction Management Conference. pp. 115-124.

Modelling economic risks in megaproject construction : a systemic approach. / Boateng, Prince; Ahiaga-Dagbui, Dominic; Chen, Zhen; Ogunlana, Stephen.

Proceedings of the 31st Annual Association of Researchers in Construction Management Conference. 2015. p. 115-124.

Research output: Chapter in Book/Report/Conference proceedingConference contribution book

TY - GEN

T1 - Modelling economic risks in megaproject construction

T2 - a systemic approach

AU - Boateng, Prince

AU - Ahiaga-Dagbui, Dominic

AU - Chen, Zhen

AU - Ogunlana, Stephen

PY - 2015/9/9

Y1 - 2015/9/9

N2 - Megaprojects present significant economic risks to their financiers and sponsors. Factors such as inflation, cash flow issues, material and energy price hikes and change in government policies can cause such capital intensive projects to overrun planned budget and schedule allocations. Where the project is a commercial asset, delayed completion time and cost overruns usually have significant impact on the profitability of the project as well as the estimated returns on investment over the operational phase of the project. Understanding the dynamics of specific risks can thus be very crucial in designing containment measures to deal with their likely impact on the project. Using a case-study of the Edinburgh Trams project in Scotland, the dynamics of identified economic risks in transportation megaprojects is presented. Through the combination of interviews, questionnaires and non-participant observation, different economic risk factors were first identified. The identified factors were then prioritised using Analytical Network Process (ANP) to establish the most salient economic variables on the Tram project. Some of these factors include material and energy price increases as a result of the 2008 recession, as well as inflation and changes in government funding policies. The selected factors from the ANP were then modelled within a System Dynamics (SD) framework to appraise their measured economic impact on the project to gain a fuller understanding of the interrelationships between the variables in the system. The mean impact of economic risks on Edinburgh Trams was estimated to be about 22%.

AB - Megaprojects present significant economic risks to their financiers and sponsors. Factors such as inflation, cash flow issues, material and energy price hikes and change in government policies can cause such capital intensive projects to overrun planned budget and schedule allocations. Where the project is a commercial asset, delayed completion time and cost overruns usually have significant impact on the profitability of the project as well as the estimated returns on investment over the operational phase of the project. Understanding the dynamics of specific risks can thus be very crucial in designing containment measures to deal with their likely impact on the project. Using a case-study of the Edinburgh Trams project in Scotland, the dynamics of identified economic risks in transportation megaprojects is presented. Through the combination of interviews, questionnaires and non-participant observation, different economic risk factors were first identified. The identified factors were then prioritised using Analytical Network Process (ANP) to establish the most salient economic variables on the Tram project. Some of these factors include material and energy price increases as a result of the 2008 recession, as well as inflation and changes in government funding policies. The selected factors from the ANP were then modelled within a System Dynamics (SD) framework to appraise their measured economic impact on the project to gain a fuller understanding of the interrelationships between the variables in the system. The mean impact of economic risks on Edinburgh Trams was estimated to be about 22%.

KW - analytical network process

KW - system dynamics

KW - megaproject

KW - Edinburgh trams

KW - economic risk

KW - cost overruns

UR - http://www.arcom.ac.uk/-docs/proceedings/b908d35bed985f2d751737631e538b37.pdf

M3 - Conference contribution book

SN - 978-0-9552390-9-0

SP - 115

EP - 124

BT - Proceedings of the 31st Annual Association of Researchers in Construction Management Conference

ER -

Boateng P, Ahiaga-Dagbui D, Chen Z, Ogunlana S. Modelling economic risks in megaproject construction: a systemic approach. In Proceedings of the 31st Annual Association of Researchers in Construction Management Conference. 2015. p. 115-124