Abstract
This paper discusses methods for assessing offshore wind farm cable reliability incorporating cost effectiveness of redundancy. It was presented at the 5th international workshop on large-scale integration of wind power and transmission networks for offshore wind farms
Original language | English |
---|---|
Number of pages | 8 |
Publication status | Published - Apr 2005 |
Event | Fifth International Workshop on Large-Scale Integration of Wind Power and Transmission Networks for Offshore Wind Farms - Glasgow, United Kingdom Duration: 7 Apr 2005 → 8 Apr 2005 |
Conference
Conference | Fifth International Workshop on Large-Scale Integration of Wind Power and Transmission Networks for Offshore Wind Farms |
---|---|
Country | United Kingdom |
City | Glasgow |
Period | 7/04/05 → 8/04/05 |
Keywords
- wind poiwer
- offshore wind farms
- offshore wind power
- cable reliability