Abstract
A range of experimental and field measurements of partial discharge (PD) activity under high voltage direct current (HVDC) conditions have been conducted with the goal of developing effective monitoring techniques for PD in HVDC cables and ancillary equipment, particularly in offshore renewable energy HVDC grid installations. Laboratory measurements on insulation test objects and cross linked polyethylene (XLPE) cable samples have been conducted to better understand the characteristics of PD activity under direct current (DC) stress in comparison with AC. In addition, long-term PD measurements carried out at both an HVDC cable aging laboratory and an in-service HVDC interconnector circuit are presented together with a description of the monitoring system architecture.
Original language | English |
---|---|
Number of pages | 6 |
Publication status | Published - 22 Jun 2015 |
Event | JICABLE 2015 - Palais des Congrès de Versailles, Versailles, France Duration: 21 Jun 2015 → 25 Jun 2015 http://www.jicable.org/2015/ |
Conference
Conference | JICABLE 2015 |
---|---|
Country/Territory | France |
City | Versailles |
Period | 21/06/15 → 25/06/15 |
Internet address |
Keywords
- HVDC
- cables
- renewables
- electricity transmission
- partial discharge
- on-line PD monitoring
- OLPD
- offshore
Fingerprint
Dive into the research topics of 'Laboratory and field partial discharge measurement in HVDC power cables'. Together they form a unique fingerprint.Projects
- 1 Finished
-
HVDC-OLPD: HVPD-Strathclyde-Alstom DECC HVDC On-Line Cable Monitor Proposal (OLPD-HVDC)
Roscoe, N., Siew, W. H., Zhu, M. & Hu, X.
1/01/14 → 1/07/15
Project: Research