Improving the efficiency of remanufacture through enhanced pre-processing inspection–a comprehensive study of over 2000 engines at Caterpillar remanufacturing, U.K.

Sara J. Ridley, W. L. Ijomah, J. R. Corney

Research output: Contribution to journalArticle

Abstract

Remanufacture, an industrial process to return used product to an “as-new” condition, is a key strategy in environmentally conscious manufacturing and waste management. However strategies to improve the efficiency of the process are hampered by a lack of remanufacturing-specific knowledge and tools. This paper presents the results of quantitative research, conducted in a Caterpillar Remanufacturing UK facility, to establish the relationship between pre-processing inspection levels and the subsequent remanufacturing process time for returned used products known as cores. It concludes that for components (i.e. cores) having either complex geometry (such as internal ports), a large number of sub-components or that are constructed from, or comprising of, multiple materials the remanufacturing process is shortened by increased inspection prior to processing. However, these benefits are currently limited by the amount of information that can be gained from the inspection methods used. The paper describes the practical use of these factors in a decision-making methodology for inspection and in a refined cost assessment tool.
LanguageEnglish
Pages259-270
Number of pages12
JournalProduction Planning and Control
Volume30
Issue number4
Early online date5 Feb 2019
DOIs
Publication statusPublished - 12 Mar 2019

Fingerprint

Inspection
Engines
Processing
Waste management
Decision making
Geometry
Remanufacturing
Costs

Keywords

  • cost-assessment
  • decision-making
  • pre-processing inspection
  • productivity
  • Remanufacturing

Cite this

@article{e5e13a0c3f494e2da351a532135ca512,
title = "Improving the efficiency of remanufacture through enhanced pre-processing inspection–a comprehensive study of over 2000 engines at Caterpillar remanufacturing, U.K.",
abstract = "Remanufacture, an industrial process to return used product to an “as-new” condition, is a key strategy in environmentally conscious manufacturing and waste management. However strategies to improve the efficiency of the process are hampered by a lack of remanufacturing-specific knowledge and tools. This paper presents the results of quantitative research, conducted in a Caterpillar Remanufacturing UK facility, to establish the relationship between pre-processing inspection levels and the subsequent remanufacturing process time for returned used products known as cores. It concludes that for components (i.e. cores) having either complex geometry (such as internal ports), a large number of sub-components or that are constructed from, or comprising of, multiple materials the remanufacturing process is shortened by increased inspection prior to processing. However, these benefits are currently limited by the amount of information that can be gained from the inspection methods used. The paper describes the practical use of these factors in a decision-making methodology for inspection and in a refined cost assessment tool.",
keywords = "cost-assessment, decision-making, pre-processing inspection, productivity, Remanufacturing",
author = "Ridley, {Sara J.} and Ijomah, {W. L.} and Corney, {J. R.}",
year = "2019",
month = "3",
day = "12",
doi = "10.1080/09537287.2018.1471750",
language = "English",
volume = "30",
pages = "259--270",
journal = "Production Planning and Control",
issn = "0953-7287",
number = "4",

}

TY - JOUR

T1 - Improving the efficiency of remanufacture through enhanced pre-processing inspection–a comprehensive study of over 2000 engines at Caterpillar remanufacturing, U.K.

AU - Ridley, Sara J.

AU - Ijomah, W. L.

AU - Corney, J. R.

PY - 2019/3/12

Y1 - 2019/3/12

N2 - Remanufacture, an industrial process to return used product to an “as-new” condition, is a key strategy in environmentally conscious manufacturing and waste management. However strategies to improve the efficiency of the process are hampered by a lack of remanufacturing-specific knowledge and tools. This paper presents the results of quantitative research, conducted in a Caterpillar Remanufacturing UK facility, to establish the relationship between pre-processing inspection levels and the subsequent remanufacturing process time for returned used products known as cores. It concludes that for components (i.e. cores) having either complex geometry (such as internal ports), a large number of sub-components or that are constructed from, or comprising of, multiple materials the remanufacturing process is shortened by increased inspection prior to processing. However, these benefits are currently limited by the amount of information that can be gained from the inspection methods used. The paper describes the practical use of these factors in a decision-making methodology for inspection and in a refined cost assessment tool.

AB - Remanufacture, an industrial process to return used product to an “as-new” condition, is a key strategy in environmentally conscious manufacturing and waste management. However strategies to improve the efficiency of the process are hampered by a lack of remanufacturing-specific knowledge and tools. This paper presents the results of quantitative research, conducted in a Caterpillar Remanufacturing UK facility, to establish the relationship between pre-processing inspection levels and the subsequent remanufacturing process time for returned used products known as cores. It concludes that for components (i.e. cores) having either complex geometry (such as internal ports), a large number of sub-components or that are constructed from, or comprising of, multiple materials the remanufacturing process is shortened by increased inspection prior to processing. However, these benefits are currently limited by the amount of information that can be gained from the inspection methods used. The paper describes the practical use of these factors in a decision-making methodology for inspection and in a refined cost assessment tool.

KW - cost-assessment

KW - decision-making

KW - pre-processing inspection

KW - productivity

KW - Remanufacturing

UR - http://www.scopus.com/inward/record.url?scp=85061026298&partnerID=8YFLogxK

UR - https://www.tandfonline.com/toc/tppc20/current

U2 - 10.1080/09537287.2018.1471750

DO - 10.1080/09537287.2018.1471750

M3 - Article

VL - 30

SP - 259

EP - 270

JO - Production Planning and Control

T2 - Production Planning and Control

JF - Production Planning and Control

SN - 0953-7287

IS - 4

ER -