Grand challenges in construction management

Research output: Contribution to journalArticle

1 Citation (Scopus)

Abstract

This article is written for the launch of the specialty section on construction management at the Frontiers in Built Environment. This new specialty section opens an on-line platform for academics and practitioners in the subject field to share valuable experiences and findings from innovative research and development as well as practices, which focus on the management of people/workforce, product/production, and processes across built environment project stages, including development and construction, operation and maintenance, as well as demolition and redevelopment, under considerations on the dependability and productivity of construction management services. In this article, the writer presents his humble opinions limited from experiences from academic research and professional services around the world in the past three decades. The topics derived on grand challenges in construction management are gigantic in terms of their coverages, but may have huge impacts on professional development in both short and longer term. Discussions presented here on grand challenges in construction management consist of four parts to respectively focus on an initial cognitive framework of the construction management body of knowledge (CMBOK), intelligence pervasive construction management systems, interdisciplinary digital innovation, and solutions for performance enhancement in megaproject delivery. The research methodology that support the writer to describe the four grand challenges includes literature review, comparison study, site observation, and system architecture analysis and development. It was the writer’s initial abductive reasoning to identify the four grand challenges in construction management through an extensive literature review, which was based on national and regional strategies for the construction industry from the world top economies. Some key references relating to these four major topics are collected to support discussions in this article. It is expected that this article could contribute to the debate as well as research and development in construction management in terms of continuous technical enhancements on project-oriented performance and value regardless the scope, the location and the time associated and concerned. As the study was conducted through abductive reasoning, this article should have its limitation on the coverage to all grand challenges in construction management, and this should leave many unanswered questions for further exploratory research.
LanguageEnglish
Article number31
Number of pages22
JournalFrontiers in Built Environment
Volume5
DOIs
Publication statusPublished - 2 Apr 2019

Fingerprint

Demolition
Construction industry
Innovation
Productivity

Keywords

  • abductive reasoning
  • built environment
  • construction management
  • body of knowledge
  • digital innovation
  • intelligent system
  • interdisciplinary research
  • megaproject management

Cite this

@article{a40c7bda29ff42e189f4d69afecd07b5,
title = "Grand challenges in construction management",
abstract = "This article is written for the launch of the specialty section on construction management at the Frontiers in Built Environment. This new specialty section opens an on-line platform for academics and practitioners in the subject field to share valuable experiences and findings from innovative research and development as well as practices, which focus on the management of people/workforce, product/production, and processes across built environment project stages, including development and construction, operation and maintenance, as well as demolition and redevelopment, under considerations on the dependability and productivity of construction management services. In this article, the writer presents his humble opinions limited from experiences from academic research and professional services around the world in the past three decades. The topics derived on grand challenges in construction management are gigantic in terms of their coverages, but may have huge impacts on professional development in both short and longer term. Discussions presented here on grand challenges in construction management consist of four parts to respectively focus on an initial cognitive framework of the construction management body of knowledge (CMBOK), intelligence pervasive construction management systems, interdisciplinary digital innovation, and solutions for performance enhancement in megaproject delivery. The research methodology that support the writer to describe the four grand challenges includes literature review, comparison study, site observation, and system architecture analysis and development. It was the writer’s initial abductive reasoning to identify the four grand challenges in construction management through an extensive literature review, which was based on national and regional strategies for the construction industry from the world top economies. Some key references relating to these four major topics are collected to support discussions in this article. It is expected that this article could contribute to the debate as well as research and development in construction management in terms of continuous technical enhancements on project-oriented performance and value regardless the scope, the location and the time associated and concerned. As the study was conducted through abductive reasoning, this article should have its limitation on the coverage to all grand challenges in construction management, and this should leave many unanswered questions for further exploratory research.",
keywords = "abductive reasoning, built environment, construction management, body of knowledge, digital innovation, intelligent system, interdisciplinary research, megaproject management",
author = "Zhen Chen",
year = "2019",
month = "4",
day = "2",
doi = "10.3389/fbuil.2019.00031",
language = "English",
volume = "5",
journal = "Frontiers in Built Environment",
issn = "2297-3362",

}

Grand challenges in construction management. / Chen, Zhen.

In: Frontiers in Built Environment, Vol. 5, 31, 02.04.2019.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Grand challenges in construction management

AU - Chen, Zhen

PY - 2019/4/2

Y1 - 2019/4/2

N2 - This article is written for the launch of the specialty section on construction management at the Frontiers in Built Environment. This new specialty section opens an on-line platform for academics and practitioners in the subject field to share valuable experiences and findings from innovative research and development as well as practices, which focus on the management of people/workforce, product/production, and processes across built environment project stages, including development and construction, operation and maintenance, as well as demolition and redevelopment, under considerations on the dependability and productivity of construction management services. In this article, the writer presents his humble opinions limited from experiences from academic research and professional services around the world in the past three decades. The topics derived on grand challenges in construction management are gigantic in terms of their coverages, but may have huge impacts on professional development in both short and longer term. Discussions presented here on grand challenges in construction management consist of four parts to respectively focus on an initial cognitive framework of the construction management body of knowledge (CMBOK), intelligence pervasive construction management systems, interdisciplinary digital innovation, and solutions for performance enhancement in megaproject delivery. The research methodology that support the writer to describe the four grand challenges includes literature review, comparison study, site observation, and system architecture analysis and development. It was the writer’s initial abductive reasoning to identify the four grand challenges in construction management through an extensive literature review, which was based on national and regional strategies for the construction industry from the world top economies. Some key references relating to these four major topics are collected to support discussions in this article. It is expected that this article could contribute to the debate as well as research and development in construction management in terms of continuous technical enhancements on project-oriented performance and value regardless the scope, the location and the time associated and concerned. As the study was conducted through abductive reasoning, this article should have its limitation on the coverage to all grand challenges in construction management, and this should leave many unanswered questions for further exploratory research.

AB - This article is written for the launch of the specialty section on construction management at the Frontiers in Built Environment. This new specialty section opens an on-line platform for academics and practitioners in the subject field to share valuable experiences and findings from innovative research and development as well as practices, which focus on the management of people/workforce, product/production, and processes across built environment project stages, including development and construction, operation and maintenance, as well as demolition and redevelopment, under considerations on the dependability and productivity of construction management services. In this article, the writer presents his humble opinions limited from experiences from academic research and professional services around the world in the past three decades. The topics derived on grand challenges in construction management are gigantic in terms of their coverages, but may have huge impacts on professional development in both short and longer term. Discussions presented here on grand challenges in construction management consist of four parts to respectively focus on an initial cognitive framework of the construction management body of knowledge (CMBOK), intelligence pervasive construction management systems, interdisciplinary digital innovation, and solutions for performance enhancement in megaproject delivery. The research methodology that support the writer to describe the four grand challenges includes literature review, comparison study, site observation, and system architecture analysis and development. It was the writer’s initial abductive reasoning to identify the four grand challenges in construction management through an extensive literature review, which was based on national and regional strategies for the construction industry from the world top economies. Some key references relating to these four major topics are collected to support discussions in this article. It is expected that this article could contribute to the debate as well as research and development in construction management in terms of continuous technical enhancements on project-oriented performance and value regardless the scope, the location and the time associated and concerned. As the study was conducted through abductive reasoning, this article should have its limitation on the coverage to all grand challenges in construction management, and this should leave many unanswered questions for further exploratory research.

KW - abductive reasoning

KW - built environment

KW - construction management

KW - body of knowledge

KW - digital innovation

KW - intelligent system

KW - interdisciplinary research

KW - megaproject management

U2 - 10.3389/fbuil.2019.00031

DO - 10.3389/fbuil.2019.00031

M3 - Article

VL - 5

JO - Frontiers in Built Environment

T2 - Frontiers in Built Environment

JF - Frontiers in Built Environment

SN - 2297-3362

M1 - 31

ER -