Flight phase control strategies for airborne wind energy systems

Research output: Contribution to conferencePaper

1 Citation (Scopus)
12 Downloads (Pure)

Abstract

Traditional Danish concept wind turbines face many constraints when upscaling in order to access higher wind speeds, such as size, mechanical loading and weight. It is possible that some of these constraints could be circumvented through use of airborne wind energy systems (AWES). With research into AWES becoming more prominent, the topic of launching and landing the system must be analysed in detail. Currently several concepts are being pursued with differing launch and land technologies. For all systems it is likely that minimising launch and land cycles will be a key objective due to increased energy costs and hardware risk in these phases. This research focuses on a cross-wind ground-based generation system and discusses the problem of the launch and land policy with regards to the wind speed at operational height. The paper also discusses the use of an airborne powered loiter phase and a grounded waiting phase. A key consideration when analysing this problem is wind speed measurement uncertainty (including the degree of temporal averaging) and how to integrate this uncertainty into any launch & land policy. The present research concerns cost-benefit analysis with respect to generated and consumed energy cost functions for each flight phase. It is found that for any given AWES there will be an optimum airborne loiter time after which a system should be landed. This avoids landings due to short-duration low wind periods. This research will be followed up by further analysis of additional cost functions such as reliability and failure aspects associated with each of the above phases. Further research will also consider the impact of short term forecasting of various accuracy levels on the optimal control policy and performance of AWES.
Original languageEnglish
Number of pages6
Publication statusPublished - 25 Sep 2018
EventWindEurope Conference & Exhibition 2018 -
Duration: 25 Sep 201828 Sep 2018

Conference

ConferenceWindEurope Conference & Exhibition 2018
Period25/09/1828/09/18

Fingerprint

Phase control
Wind power
Landing
Cost functions
Cost benefit analysis
Launching
Wind turbines
Hardware
Costs

Keywords

  • airborne wind energy systems (AWES)
  • airborne wind energy (AWE)
  • wind energy

Cite this

Warnock, J., McMillan, D., & Tabor, S. (2018). Flight phase control strategies for airborne wind energy systems. Paper presented at WindEurope Conference & Exhibition 2018, .
Warnock, John ; McMillan, David ; Tabor, Samuel. / Flight phase control strategies for airborne wind energy systems. Paper presented at WindEurope Conference & Exhibition 2018, .6 p.
@conference{e8f8775dc2e94c1cbc5163c8d9bb06e5,
title = "Flight phase control strategies for airborne wind energy systems",
abstract = "Traditional Danish concept wind turbines face many constraints when upscaling in order to access higher wind speeds, such as size, mechanical loading and weight. It is possible that some of these constraints could be circumvented through use of airborne wind energy systems (AWES). With research into AWES becoming more prominent, the topic of launching and landing the system must be analysed in detail. Currently several concepts are being pursued with differing launch and land technologies. For all systems it is likely that minimising launch and land cycles will be a key objective due to increased energy costs and hardware risk in these phases. This research focuses on a cross-wind ground-based generation system and discusses the problem of the launch and land policy with regards to the wind speed at operational height. The paper also discusses the use of an airborne powered loiter phase and a grounded waiting phase. A key consideration when analysing this problem is wind speed measurement uncertainty (including the degree of temporal averaging) and how to integrate this uncertainty into any launch & land policy. The present research concerns cost-benefit analysis with respect to generated and consumed energy cost functions for each flight phase. It is found that for any given AWES there will be an optimum airborne loiter time after which a system should be landed. This avoids landings due to short-duration low wind periods. This research will be followed up by further analysis of additional cost functions such as reliability and failure aspects associated with each of the above phases. Further research will also consider the impact of short term forecasting of various accuracy levels on the optimal control policy and performance of AWES.",
keywords = "airborne wind energy systems (AWES), airborne wind energy (AWE), wind energy",
author = "John Warnock and David McMillan and Samuel Tabor",
year = "2018",
month = "9",
day = "25",
language = "English",
note = "WindEurope Conference & Exhibition 2018 ; Conference date: 25-09-2018 Through 28-09-2018",

}

Warnock, J, McMillan, D & Tabor, S 2018, 'Flight phase control strategies for airborne wind energy systems' Paper presented at WindEurope Conference & Exhibition 2018, 25/09/18 - 28/09/18, .

Flight phase control strategies for airborne wind energy systems. / Warnock, John; McMillan, David; Tabor, Samuel.

2018. Paper presented at WindEurope Conference & Exhibition 2018, .

Research output: Contribution to conferencePaper

TY - CONF

T1 - Flight phase control strategies for airborne wind energy systems

AU - Warnock, John

AU - McMillan, David

AU - Tabor, Samuel

PY - 2018/9/25

Y1 - 2018/9/25

N2 - Traditional Danish concept wind turbines face many constraints when upscaling in order to access higher wind speeds, such as size, mechanical loading and weight. It is possible that some of these constraints could be circumvented through use of airborne wind energy systems (AWES). With research into AWES becoming more prominent, the topic of launching and landing the system must be analysed in detail. Currently several concepts are being pursued with differing launch and land technologies. For all systems it is likely that minimising launch and land cycles will be a key objective due to increased energy costs and hardware risk in these phases. This research focuses on a cross-wind ground-based generation system and discusses the problem of the launch and land policy with regards to the wind speed at operational height. The paper also discusses the use of an airborne powered loiter phase and a grounded waiting phase. A key consideration when analysing this problem is wind speed measurement uncertainty (including the degree of temporal averaging) and how to integrate this uncertainty into any launch & land policy. The present research concerns cost-benefit analysis with respect to generated and consumed energy cost functions for each flight phase. It is found that for any given AWES there will be an optimum airborne loiter time after which a system should be landed. This avoids landings due to short-duration low wind periods. This research will be followed up by further analysis of additional cost functions such as reliability and failure aspects associated with each of the above phases. Further research will also consider the impact of short term forecasting of various accuracy levels on the optimal control policy and performance of AWES.

AB - Traditional Danish concept wind turbines face many constraints when upscaling in order to access higher wind speeds, such as size, mechanical loading and weight. It is possible that some of these constraints could be circumvented through use of airborne wind energy systems (AWES). With research into AWES becoming more prominent, the topic of launching and landing the system must be analysed in detail. Currently several concepts are being pursued with differing launch and land technologies. For all systems it is likely that minimising launch and land cycles will be a key objective due to increased energy costs and hardware risk in these phases. This research focuses on a cross-wind ground-based generation system and discusses the problem of the launch and land policy with regards to the wind speed at operational height. The paper also discusses the use of an airborne powered loiter phase and a grounded waiting phase. A key consideration when analysing this problem is wind speed measurement uncertainty (including the degree of temporal averaging) and how to integrate this uncertainty into any launch & land policy. The present research concerns cost-benefit analysis with respect to generated and consumed energy cost functions for each flight phase. It is found that for any given AWES there will be an optimum airborne loiter time after which a system should be landed. This avoids landings due to short-duration low wind periods. This research will be followed up by further analysis of additional cost functions such as reliability and failure aspects associated with each of the above phases. Further research will also consider the impact of short term forecasting of various accuracy levels on the optimal control policy and performance of AWES.

KW - airborne wind energy systems (AWES)

KW - airborne wind energy (AWE)

KW - wind energy

UR - https://windeurope.org/summit2018/

M3 - Paper

ER -

Warnock J, McMillan D, Tabor S. Flight phase control strategies for airborne wind energy systems. 2018. Paper presented at WindEurope Conference & Exhibition 2018, .