Projects per year
Abstract
Aggregation by Virtual Power Plants to provide flexibility to distribution and transmission networks is seen as an important element in the transition to Net-zero. This paper presents work carried out in the SIES 2022 ERA-Net project, which is investigating in detail the possible provision of flexibility by different technologies but thorough a lens of different business models. Thus, presented work relies on the real use cases. The focus of this work is on the overall architecture (hardware and software) of the demonstrator plant in East Kilbride Scotland and the integration of assets. The paper highlights challenges and lessons learned, during this process.
Original language | English |
---|---|
Pages (from-to) | 3679-3683 |
Number of pages | 5 |
Journal | IET Conference Proceedings |
Volume | 2023 |
Issue number | 6 |
Early online date | 4 Jul 2023 |
DOIs | |
Publication status | Published - 6 Aug 2024 |
Event | 27th International Conference on Electricity Distribution (CIRED 2023) - Rome, Rome, Italy Duration: 12 Jun 2023 → 15 Jun 2023 http://www.cired2023.org |
Keywords
- VPP
- design and simulation
- pilot project
- virtual power plants
- software engineering
Fingerprint
Dive into the research topics of 'Enhanced virtual power plant design and implementation lessons'. Together they form a unique fingerprint.Projects
- 1 Finished
-
SIES 2022: Smart Integrated Energy Systems: Enhanced Virtual Power Plant VPP+ Energy Pool Intergration for Local and Regional Resistance
Tuohy, P. G. (Principal Investigator), Burt, G. (Co-investigator) & Kockar, I. (Co-investigator)
European Commission - Horizon Europe + H2020
14/12/19 → 14/12/22
Project: Research
Research output
- 1 Paper
-
Enhanced virtual power plant design and implementation lessons
Howorth, G., Kockar, I., Tuohy, P., Flett, G. & Bingham, J., 12 Jun 2023, p. 11344. 5 p.Research output: Contribution to conference › Paper › peer-review
Open AccessFile