Abstract
Paper outlines a demonstrator programme which will install 2 x 5MW RePower wind turbines. Existing platforms will be used to connect demonstrator wind turbines
and infrastructure can be used for a full scale 1GW wind farm.
and infrastructure can be used for a full scale 1GW wind farm.
| Original language | English |
|---|---|
| Pages | 326-333 |
| Number of pages | 7 |
| Publication status | Published - 2005 |
| Event | IEA Annex XXIII: Offshore wind energy technology and deployment: WORKSHOP ON WIND INTEGRATION OF OFFSHORE WIND POWER - Manchester, United Kingdom Duration: 12 Sept 2005 → 13 Sept 2005 |
Conference
| Conference | IEA Annex XXIII: Offshore wind energy technology and deployment: WORKSHOP ON WIND INTEGRATION OF OFFSHORE WIND POWER |
|---|---|
| Country/Territory | United Kingdom |
| City | Manchester |
| Period | 12/09/05 → 13/09/05 |
Keywords
- wind energy
- offshore wind power
- wind farms