Developing a successful residential proposal that meets the specific requirements of the Clydeside Regeneration Project

Research output: Contribution to conferenceSpeech

Abstract

What are the specific challenges for the Clydeside regeneration area? Outlining how the proposal was won and the process for securing the work. Evaluating the challenge of being a small part of a large team. How does this scheme fit in with the larger Glasgow Vision, and what have the challenges been in being a small part of a large development?
LanguageEnglish
Publication statusPublished - 1 Oct 2008
EventDevelop & Unify Conference - The Lighthouse, Glasgow, UK
Duration: 1 Oct 2008 → …

Conference

ConferenceDevelop & Unify Conference
CityThe Lighthouse, Glasgow, UK
Period1/10/08 → …

Keywords

  • glasgow
  • clydeside regeneration area
  • residential proposal

Cite this

@conference{7ec67cf918904c40bc7390cf5d187795,
title = "Developing a successful residential proposal that meets the specific requirements of the Clydeside Regeneration Project",
abstract = "What are the specific challenges for the Clydeside regeneration area? Outlining how the proposal was won and the process for securing the work. Evaluating the challenge of being a small part of a large team. How does this scheme fit in with the larger Glasgow Vision, and what have the challenges been in being a small part of a large development?",
keywords = "glasgow, clydeside regeneration area, residential proposal",
author = "Gordon Murray",
year = "2008",
month = "10",
day = "1",
language = "English",
note = "Develop & Unify Conference ; Conference date: 01-10-2008",

}

Developing a successful residential proposal that meets the specific requirements of the Clydeside Regeneration Project. / Murray, Gordon.

2008. Develop & Unify Conference, The Lighthouse, Glasgow, UK, .

Research output: Contribution to conferenceSpeech

TY - CONF

T1 - Developing a successful residential proposal that meets the specific requirements of the Clydeside Regeneration Project

AU - Murray, Gordon

PY - 2008/10/1

Y1 - 2008/10/1

N2 - What are the specific challenges for the Clydeside regeneration area? Outlining how the proposal was won and the process for securing the work. Evaluating the challenge of being a small part of a large team. How does this scheme fit in with the larger Glasgow Vision, and what have the challenges been in being a small part of a large development?

AB - What are the specific challenges for the Clydeside regeneration area? Outlining how the proposal was won and the process for securing the work. Evaluating the challenge of being a small part of a large team. How does this scheme fit in with the larger Glasgow Vision, and what have the challenges been in being a small part of a large development?

KW - glasgow

KW - clydeside regeneration area

KW - residential proposal

UR - http://www.3dreid.com/uploads/content/objects/310/Glasgow_brochure.pdf

M3 - Speech

ER -