Abstract
The project to modify Glenfarg Water Treatment Works by Scottish Water, working in conjunction with its partners Black and Veatch Ltd. and Scottish Water Solutions, received a gold award and ‘the ultimate accolade’ of ‘The Most
Considerate Site 2009’ at the considerate constructors scheme (CCS) awards. Although previous projects undertaken by Scottish Water have achieved high considerate constructor scores, Glenfarg exceeded previous projects’ standards. This level of performance was delivered across the eight categories of the scheme: considerate, environment, cleanliness, good neighbour, respectful, safe responsible and accountable. The steps the project team took under each of these categories to deliver the project are reviewed in this article. The article also outlines some of the challenges the project team faced while delivering such a high level of performance. Furthermore, the article makes particular reference to ‘soft’ management skills and the development of a project organisational culture that emphasised pride and passion through engagement of the workforce. Overall, the article presents valuable insights into how performing beyond the CCS requirements remains a dynamic and ongoing activity for all parties involved with the scheme.
Considerate Site 2009’ at the considerate constructors scheme (CCS) awards. Although previous projects undertaken by Scottish Water have achieved high considerate constructor scores, Glenfarg exceeded previous projects’ standards. This level of performance was delivered across the eight categories of the scheme: considerate, environment, cleanliness, good neighbour, respectful, safe responsible and accountable. The steps the project team took under each of these categories to deliver the project are reviewed in this article. The article also outlines some of the challenges the project team faced while delivering such a high level of performance. Furthermore, the article makes particular reference to ‘soft’ management skills and the development of a project organisational culture that emphasised pride and passion through engagement of the workforce. Overall, the article presents valuable insights into how performing beyond the CCS requirements remains a dynamic and ongoing activity for all parties involved with the scheme.
Original language | English |
---|---|
Pages (from-to) | 49-57 |
Number of pages | 9 |
Journal | Proceedings of the ICE - Engineering Sustainability |
Volume | 164 |
Issue number | 1 |
DOIs | |
Publication status | Published - 1 Mar 2011 |
Keywords
- Glenfarg water treatment works
- Scottish water
- project management
- water supply
- codes of practice