Projects per year
Abstract
This web page provides graphical access to the LV power quality monitoring data captured during the Capacity to Customers (C2C) project. The project has been led by Electricity North West Limited (ENWL), a distribution network operator in the UK. The measurements have been made at secondary (HV to LV) substations throughout ENWL's network, during 2013 and 2014.
Original language | English |
---|---|
Place of Publication | Glasgow |
Publisher | University of Strathclyde |
Media of output | Online |
Publication status | Published - 2015 |
Keywords
- LV power quality monitoring
- load duration curves
- voltage
- apparent power
- real power
- reactive power
- power factor
Fingerprint
Dive into the research topics of 'C2C power quality monitoring'. Together they form a unique fingerprint.Projects
- 1 Finished
-
Electricity North West low carbon project
Booth, C. (Principal Investigator)
15/08/12 → 31/01/15
Project: Research
-
Automatically detecting and correcting errors in power quality monitoring data
Blair, S. M., Booth, C. D., Williamson, G., Poralis, A. & Turnham, V., 24 Aug 2016, In: IEEE Transactions on Power Delivery. 32, 2, p. 1005-1013 9 p.Research output: Contribution to journal › Article › peer-review
Open AccessFile35 Citations (Scopus)219 Downloads (Pure) -
Analysis of the Technical Performance of C2C Operation for HV Networks
Blair, S. & Booth, C., 15 Dec 2014, University of Strathclyde. 152 p.Research output: Book/Report › Commissioned report
Open AccessFile