Assessing policy constraints and technical feasibility of energy developments in cities

Raheal McGhee, Joseph Clarke, Katalin Svehla

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Abstract

GOMap (Geospatial Opportunity Map) was developed to support informed decisions concerning the siting of renewable energy systems in cities. It examined installing freestanding solar photovoltaic (PV) farms in Glasgow’s Vacant and Derelict Land (VDL) and was implemented as an interactive Geographic Information System. In evaluating whether a site was suitable for renewable energy deployment, two sets of constraints were considered: technical factors which were imposed by the location on the achievable power level; policy factors which affected the likelihood of receiving planning permission. Two scoring methods were applied which generated different perceptions concerning the size of opportunity available, based on a 50x50 m grid across Glasgow. The stringent method applied the highest score for any individual layer as the combined score and resulted in 15.7 % of the VDL area as technically favourable and 7.8 % as politically possible; the recommended lenient method summed the individual factor scores and displayed 42.9 % as technically favourable and 46.8 % as politically possible. Focusing on the lenient method, it was found that 285 ha of suitable VDL could allow for 142,708 solar PV panels to be built, equating to an energy yield of 344.55 MWh/yr which could provide energy for ~70,000 dwellings.
LanguageEnglish
Title of host publicationDesign to Thrive
Subtitle of host publicationProceedings of 33rd PLEA International Conference
EditorsLuisa Brotas, Susan Roaf, Fergus Nicol
Place of PublicationEdinburgh
Pages1446-1453
Number of pages8
Volume1
StatePublished - 2 Jul 2017
Event33rd International Conference on Passive and Low Energy Architecture: Design to Thrive - Royal Society of Edinburgh, Edinburgh, United Kingdom
Duration: 3 Jul 20175 Jul 2017
https://plea2017.net/

Conference

Conference33rd International Conference on Passive and Low Energy Architecture
Abbreviated titlePLEA 2017
CountryUnited Kingdom
CityEdinburgh
Period3/07/175/07/17
Internet address

Fingerprint

energy
farm
policy
method
city
land
geographic information system
decision
planning permission
dwelling

Keywords

  • energy
  • renewables
  • geospatial

Cite this

McGhee, R., Clarke, J., & Svehla, K. (2017). Assessing policy constraints and technical feasibility of energy developments in cities. In L. Brotas, S. Roaf, & F. Nicol (Eds.), Design to Thrive: Proceedings of 33rd PLEA International Conference (Vol. 1, pp. 1446-1453). Edinburgh.
McGhee, Raheal ; Clarke, Joseph ; Svehla, Katalin. / Assessing policy constraints and technical feasibility of energy developments in cities. Design to Thrive: Proceedings of 33rd PLEA International Conference. editor / Luisa Brotas ; Susan Roaf ; Fergus Nicol. Vol. 1 Edinburgh, 2017. pp. 1446-1453
@inproceedings{2dd66cad09cf4dc4bc4da1583ecdc3e2,
title = "Assessing policy constraints and technical feasibility of energy developments in cities",
abstract = "GOMap (Geospatial Opportunity Map) was developed to support informed decisions concerning the siting of renewable energy systems in cities. It examined installing freestanding solar photovoltaic (PV) farms in Glasgow’s Vacant and Derelict Land (VDL) and was implemented as an interactive Geographic Information System. In evaluating whether a site was suitable for renewable energy deployment, two sets of constraints were considered: technical factors which were imposed by the location on the achievable power level; policy factors which affected the likelihood of receiving planning permission. Two scoring methods were applied which generated different perceptions concerning the size of opportunity available, based on a 50x50 m grid across Glasgow. The stringent method applied the highest score for any individual layer as the combined score and resulted in 15.7 {\%} of the VDL area as technically favourable and 7.8 {\%} as politically possible; the recommended lenient method summed the individual factor scores and displayed 42.9 {\%} as technically favourable and 46.8 {\%} as politically possible. Focusing on the lenient method, it was found that 285 ha of suitable VDL could allow for 142,708 solar PV panels to be built, equating to an energy yield of 344.55 MWh/yr which could provide energy for ~70,000 dwellings.",
keywords = "energy, renewables, geospatial",
author = "Raheal McGhee and Joseph Clarke and Katalin Svehla",
year = "2017",
month = "7",
day = "2",
language = "English",
isbn = "978-0-9928957-5-4",
volume = "1",
pages = "1446--1453",
editor = "Luisa Brotas and Susan Roaf and Fergus Nicol",
booktitle = "Design to Thrive",

}

McGhee, R, Clarke, J & Svehla, K 2017, Assessing policy constraints and technical feasibility of energy developments in cities. in L Brotas, S Roaf & F Nicol (eds), Design to Thrive: Proceedings of 33rd PLEA International Conference. vol. 1, Edinburgh, pp. 1446-1453, 33rd International Conference on Passive and Low Energy Architecture, Edinburgh, United Kingdom, 3/07/17.

Assessing policy constraints and technical feasibility of energy developments in cities. / McGhee, Raheal; Clarke, Joseph; Svehla, Katalin.

Design to Thrive: Proceedings of 33rd PLEA International Conference. ed. / Luisa Brotas; Susan Roaf; Fergus Nicol. Vol. 1 Edinburgh, 2017. p. 1446-1453.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

TY - GEN

T1 - Assessing policy constraints and technical feasibility of energy developments in cities

AU - McGhee,Raheal

AU - Clarke,Joseph

AU - Svehla,Katalin

PY - 2017/7/2

Y1 - 2017/7/2

N2 - GOMap (Geospatial Opportunity Map) was developed to support informed decisions concerning the siting of renewable energy systems in cities. It examined installing freestanding solar photovoltaic (PV) farms in Glasgow’s Vacant and Derelict Land (VDL) and was implemented as an interactive Geographic Information System. In evaluating whether a site was suitable for renewable energy deployment, two sets of constraints were considered: technical factors which were imposed by the location on the achievable power level; policy factors which affected the likelihood of receiving planning permission. Two scoring methods were applied which generated different perceptions concerning the size of opportunity available, based on a 50x50 m grid across Glasgow. The stringent method applied the highest score for any individual layer as the combined score and resulted in 15.7 % of the VDL area as technically favourable and 7.8 % as politically possible; the recommended lenient method summed the individual factor scores and displayed 42.9 % as technically favourable and 46.8 % as politically possible. Focusing on the lenient method, it was found that 285 ha of suitable VDL could allow for 142,708 solar PV panels to be built, equating to an energy yield of 344.55 MWh/yr which could provide energy for ~70,000 dwellings.

AB - GOMap (Geospatial Opportunity Map) was developed to support informed decisions concerning the siting of renewable energy systems in cities. It examined installing freestanding solar photovoltaic (PV) farms in Glasgow’s Vacant and Derelict Land (VDL) and was implemented as an interactive Geographic Information System. In evaluating whether a site was suitable for renewable energy deployment, two sets of constraints were considered: technical factors which were imposed by the location on the achievable power level; policy factors which affected the likelihood of receiving planning permission. Two scoring methods were applied which generated different perceptions concerning the size of opportunity available, based on a 50x50 m grid across Glasgow. The stringent method applied the highest score for any individual layer as the combined score and resulted in 15.7 % of the VDL area as technically favourable and 7.8 % as politically possible; the recommended lenient method summed the individual factor scores and displayed 42.9 % as technically favourable and 46.8 % as politically possible. Focusing on the lenient method, it was found that 285 ha of suitable VDL could allow for 142,708 solar PV panels to be built, equating to an energy yield of 344.55 MWh/yr which could provide energy for ~70,000 dwellings.

KW - energy

KW - renewables

KW - geospatial

UR - https://plea2017.net/wp-content/themes/plea2017/docs/R_PLEA2017_proceedings_volume_I.pdf

UR - https://plea2017.net/

M3 - Conference contribution

SN - 978-0-9928957-5-4

VL - 1

SP - 1446

EP - 1453

BT - Design to Thrive

CY - Edinburgh

ER -

McGhee R, Clarke J, Svehla K. Assessing policy constraints and technical feasibility of energy developments in cities. In Brotas L, Roaf S, Nicol F, editors, Design to Thrive: Proceedings of 33rd PLEA International Conference. Vol. 1. Edinburgh. 2017. p. 1446-1453.