Projects per year
Abstract
Aggregation by Virtual Power Plants to provide flexibility to distribution and transmission networks is seen as an important element in the transition to Net-zero. This paper presents work carried out in the SIES 2022 ERA-Net project, which is investigating in detail the possible provision of flexibility by different technologies, including EVs, but thorough a lens of different business models. Thus, presented work relies on the real use cases. The focus of this work is on the construction of grid representations to guide bidding in potential flexibility markets. It shows that without an appropriate level of detail on the wider grid connections, these bidding strategies, and therefore associated asset optimization schedules, could lead to errors. A methodology that derives EV price response curves is highlighted, with an aim to use such curves in sophisticated optimization scheduling module for further work in management of EV integration.
Original language | English |
---|---|
Pages | 1412 |
Number of pages | 1 |
Publication status | Published - 2 Jun 2022 |
Event | CIRED Porto Workshop 2022: E-mobility and Power Distribution Systems - Centro de Congressos da Alfândega do Porto, Porto, Portugal Duration: 2 Jun 2022 → 3 Jun 2022 |
Conference
Conference | CIRED Porto Workshop 2022 |
---|---|
Abbreviated title | CIRED 2022 |
Country/Territory | Portugal |
City | Porto |
Period | 2/06/22 → 3/06/22 |
Keywords
- distibution grid
- Electric Vehicle
- flexibility
- optimal power flow
- virtual power plant
- VPP
- simulation and modeling
- bidding behaviour
Fingerprint
Dive into the research topics of 'An enhanced virtual power plant for flexibility services into a local area (including EVs)'. Together they form a unique fingerprint.Projects
- 1 Finished
-
SIES 2022: Smart Integrated Energy Systems: Enhanced Virtual Power Plant VPP+ Energy Pool Intergration for Local and Regional Resistance
Tuohy, P. G. (Principal Investigator), Burt, G. (Co-investigator) & Kockar, I. (Co-investigator)
European Commission - Horizon Europe + H2020
14/12/19 → 14/12/22
Project: Research
Research output
- 3 Paper
-
Enhanced virtual power plant design and implementation lessons
Howorth, G., Kockar, I., Tuohy, P., Flett, G. & Bingham, J., 12 Jun 2023, p. 11344. 5 p.Research output: Contribution to conference › Paper › peer-review
Open AccessFile -
The impact of forecasting accuracy on the economic performance of flexibility provision
Howorth, G., Kockar, I., Tuohy, P., Flett, G. & Bingham, J., 12 Jun 2023, p. 11481. 5 p.Research output: Contribution to conference › Paper › peer-review
Open AccessFile -
An enhanced virtual power plant for flexibility services into a local area (including EV's)
Howorth, G., Kockar, I., Tuohy, P. & Bingham, J., 2 Jun 2022, p. 1412. 5 p.Research output: Contribution to conference › Paper › peer-review
Open AccessFile