A fuzzy system for evaluating the risk of change in construction projects

Ibrahim A. Motawa, Chimay J. Anumba, Ashraf El-Hamalawi

Research output: Contribution to journalArticle

34 Citations (Scopus)

Abstract

A major source of risk in construction is the potential changes occurring during the project lifetime. Changes in construction projects often result from the uncertainty associated with the imprecise and vague knowledge of much project information at the early stages of projects. IT systems for change management largely focus on managing reactive changes, in which changes are recorded and then propagated to the concerned project members. However, proactive change management is hardly dealt with. Proactive change management requires estimating the likelihood of occurrence of a change event as well as estimating the degree of change impacts on project parameters. A fuzzy system is proposed in this paper to maintain these requirements. The system simulates the relationships between change causes and effects, and is intended to facilitate proactive change management on projects.

LanguageEnglish
Pages583-591
Number of pages9
JournalAdvances in Engineering Software
Volume37
Issue number9
DOIs
Publication statusPublished - Sep 2006

Fingerprint

Fuzzy systems

Keywords

  • change management
  • fuzzy models
  • risk assessment

Cite this

Motawa, Ibrahim A. ; Anumba, Chimay J. ; El-Hamalawi, Ashraf. / A fuzzy system for evaluating the risk of change in construction projects. In: Advances in Engineering Software. 2006 ; Vol. 37, No. 9. pp. 583-591.
@article{7a83fe79db52482da84ab53dd8add287,
title = "A fuzzy system for evaluating the risk of change in construction projects",
abstract = "A major source of risk in construction is the potential changes occurring during the project lifetime. Changes in construction projects often result from the uncertainty associated with the imprecise and vague knowledge of much project information at the early stages of projects. IT systems for change management largely focus on managing reactive changes, in which changes are recorded and then propagated to the concerned project members. However, proactive change management is hardly dealt with. Proactive change management requires estimating the likelihood of occurrence of a change event as well as estimating the degree of change impacts on project parameters. A fuzzy system is proposed in this paper to maintain these requirements. The system simulates the relationships between change causes and effects, and is intended to facilitate proactive change management on projects.",
keywords = "change management, fuzzy models, risk assessment",
author = "Motawa, {Ibrahim A.} and Anumba, {Chimay J.} and Ashraf El-Hamalawi",
year = "2006",
month = "9",
doi = "10.1016/j.advengsoft.2006.01.006",
language = "English",
volume = "37",
pages = "583--591",
journal = "Advances in Engineering Software",
issn = "0965-9978",
number = "9",

}

A fuzzy system for evaluating the risk of change in construction projects. / Motawa, Ibrahim A.; Anumba, Chimay J.; El-Hamalawi, Ashraf.

In: Advances in Engineering Software, Vol. 37, No. 9, 09.2006, p. 583-591.

Research output: Contribution to journalArticle

TY - JOUR

T1 - A fuzzy system for evaluating the risk of change in construction projects

AU - Motawa, Ibrahim A.

AU - Anumba, Chimay J.

AU - El-Hamalawi, Ashraf

PY - 2006/9

Y1 - 2006/9

N2 - A major source of risk in construction is the potential changes occurring during the project lifetime. Changes in construction projects often result from the uncertainty associated with the imprecise and vague knowledge of much project information at the early stages of projects. IT systems for change management largely focus on managing reactive changes, in which changes are recorded and then propagated to the concerned project members. However, proactive change management is hardly dealt with. Proactive change management requires estimating the likelihood of occurrence of a change event as well as estimating the degree of change impacts on project parameters. A fuzzy system is proposed in this paper to maintain these requirements. The system simulates the relationships between change causes and effects, and is intended to facilitate proactive change management on projects.

AB - A major source of risk in construction is the potential changes occurring during the project lifetime. Changes in construction projects often result from the uncertainty associated with the imprecise and vague knowledge of much project information at the early stages of projects. IT systems for change management largely focus on managing reactive changes, in which changes are recorded and then propagated to the concerned project members. However, proactive change management is hardly dealt with. Proactive change management requires estimating the likelihood of occurrence of a change event as well as estimating the degree of change impacts on project parameters. A fuzzy system is proposed in this paper to maintain these requirements. The system simulates the relationships between change causes and effects, and is intended to facilitate proactive change management on projects.

KW - change management

KW - fuzzy models

KW - risk assessment

UR - http://www.scopus.com/inward/record.url?scp=33746375011&partnerID=8YFLogxK

U2 - 10.1016/j.advengsoft.2006.01.006

DO - 10.1016/j.advengsoft.2006.01.006

M3 - Article

VL - 37

SP - 583

EP - 591

JO - Advances in Engineering Software

T2 - Advances in Engineering Software

JF - Advances in Engineering Software

SN - 0965-9978

IS - 9

ER -