The development and validation of a reduced UK power system dynamic model for wider system stability and protection studies (National Grid Secondment))

  • Emhemed, Abdullah (Principal Investigator)

Project: Internally funded project

Project Details

Description

This project is funded by the EPSRC IAA to support the secondment to the UK National Grid to support the engagement between the University of Strathclyde in a focused time period and accelerate the development of accurate power systems dynamic models and support the realisation of more valid network protection and control solutions, as well as encouraging more future collaboration in different areas.
StatusFinished
Effective start/end date13/01/1410/02/14

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.