Project Details
| Status | Finished |
|---|---|
| Effective start/end date | 6/03/17 → 5/04/17 |
Funding
- OTN Systems NV
Equipment
-
Dynamic Power Systems Laboratory
Burt, G. (Manager)
Electronic And Electrical EngineeringFacility/equipment: Facility
Activities
- 1 Invited talk
-
Validating and Securing Teleprotection over Packet Networks
Blair, S. M. (Speaker)
29 Mar 2017Activity: Talk or Presentation › Invited talk