Realising Energy Storage Technologies in Low-carbon Energy Systems (RESTLESS)

Project: Research

Project Details

StatusFinished
Effective start/end date1/09/1531/08/19

Funding

  • EPSRC (Engineering and Physical Sciences Research Council): £134,647.00

Research Output

Assessing the value of increasing GB interconnection

Bukhsh, W., MacIver, C. & Bell, K., 11 Feb 2020, (Accepted/In press). 9 p.

Research output: Contribution to conferencePaper

Open Access
File
  • 1 Downloads (Pure)

    OATS: Optimisation and Analysis Toolbox for power Systems

    Bukhsh, W. A., Edmunds, C. & Bell, K. R. W., 29 Mar 2020, (Accepted/In press) In : IEEE Transactions on Power Systems.

    Research output: Contribution to journalArticle

    Open Access
    File
  • 16 Downloads (Pure)

    The impact of reduced system inertia on system planning and HVDC interconnection

    Bukhsh, W., Nedd, M., MacIver, C. & Bell, K., 10 Feb 2020, (Accepted/In press).

    Research output: Contribution to conferencePaper

  • Student Theses

    Spatial and temporal disaggregation of whole system energy models through exemplar local multi-carrier networks

    Author: Hawker, G., 21 Sep 2018

    Supervisor: Bell, K. (Supervisor) & Kockar, I. (Supervisor)

    Student thesis: Doctoral Thesis