Project Details
Status | Finished |
---|---|
Effective start/end date | 1/12/18 → 1/07/21 |
Funding
- Altrad Babcock Limited (formerly Doosan Babcock Limited)
- Devonport Royal Dockyard Ltd (Babcock)
- EDF Energy Nuclear Generation Limited
- Bruce Power L.P.
- Devonport Royal Dockyard Ltd (Babcock)
- EDF Energy Nuclear Generation Limited
- Bruce Power L.P.
Keywords
- Graphite
- AGR
- Inspection