Project Details
Status | Active |
---|---|
Effective start/end date | 1/07/18 → 31/03/23 |
Funding
- Devonport Royal Dockyard Ltd (Babcock)
- EDF Energy Nuclear Generation Limited
- Bruce Power L.P.
- Doosan Babcock Limited
- Devonport Royal Dockyard Ltd (Babcock)
- EDF Energy Nuclear Generation Limited
- Bruce Power L.P.
- Doosan Babcock Limited
- Devonport Royal Dockyard Ltd (Babcock)
- EDF Energy Nuclear Generation Limited
- Bruce Power L.P.