Skip to main navigation Skip to search Skip to main content

ALICS Deployment at Operational Nuclear Power Station

Project: Research

Project Details

Description

This project deployed the Adaptive Lighting for the Inspection of Concrete Structures (ALICS) system at a UK operational nuclear power station. The ALICS system was used to inspect a concrete wall for Equans.

Equans funding contribution: £3,690
StatusFinished
Effective start/end date6/11/2328/02/24

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.