A Feasibility Study on Hydropower Generation by Hydrostatic Pressure

  • Xiao, Qing (Principal Investigator)
  • Liu, Wendi (Researcher)

Project: Knowledge Exchange (Services/Consultancy)

Project Details

Description

The project is commissioned by the Subsea Hydropower Ltd and supported by the ETP Knowledge Exchange Network Engagement Fund. This project will carry out mathematical modelling to ascertain the feasibility of the proposed subsea turbine design.
If the design is not feasible as it stands then changes will be suggested to achieve this.
Should the initial design as provided prove feasible then improvements will be suggested so as to increase overall efficiency of the product.
StatusFinished
Effective start/end date8/06/1813/07/18

Keywords

  • Hydropower

Fingerprint

Explore the research topics touched on by this project. These labels are generated based on the underlying awards/grants. Together they form a unique fingerprint.